| How is the condition of your Spindle Disc?
The overhaul is done in 10 years from 5 years usually.
It was either whether to buy all assembly in the manufacture site,or overhauled it.
The most will be done in the United States at the overhaul.
As for that, it will cost a lot of charges for go and return.
The price becomes high about new one in that case.
Our overhaul system is very low cost.
Up to now, shaft“A”can be used only for “A”.But after overhauling, rod“A”comes to be able to use all positions.
The reason are very easy, our 48 of one unit shaft diameters are all the same as bushing, we can not manufacture at 48 kinds of those shafts as inferior.
This overhaul is very effective. As for you, if this is done, the necessity with various size rods already are lost all, nomore!
We recommend to keep“one set”in preparation for the emergency because it can be used anywhere.
Perhaps, we think you have the shaft of a lot of sizes.
These might be stamped with any number such as 88 to 91 or 92 on the bottom face of those shaft.
If A station has 88, we adjust all shaft to 88.
However, that thinking is too old to use on this item already, our shaft can be done because a very high recision manufacturing only by a constant size.
This overhauling have any style and costs, if you want to all for renewal on your disc at complete, the cost will be approximate 1/3 from usual manufacturere price and freight of going and back charge.
In case of bushing location only, that cost will be 1/5 of new one and freight charge, we are waiting for your calling any time, please ask to quote first!
|